Purge and Pressurization Systems (Ex p)
Ex p pressurization protection allows equipment that is not explosion-proof, for example panels, analysers or large motors, to be installed in hazardous areas by keeping a protective gas inside the enclosure at a higher pressure than the outside atmosphere. The system purges the interior of the enclosure before start-up and continuously monitors pressure or flow, and sizing follows the volume and power of the protected equipment.
The principle of pressurization, covered in Part 2 of the IEC 60079 series, is simple: the protective gas, usually clean air or inert gas, maintains an overpressure inside the enclosure relative to the outside, so that the explosive atmosphere cannot enter. Before the equipment is energised, the interior is purged with a volume of gas determined by calculation, to remove any explosive mixture remaining. Only after purging and after the overpressure has been reached does the control unit allow power to be applied. If the pressure drops, the system gives a warning or disconnects the supply, depending on the zone and the protected equipment.
A complete system comprises the enclosure or room, the control and monitoring unit, regulating valves, a protective gas supply line and, sometimes, an exhaust device with a flame arrester. There are versions with continuous gas leakage, for enclosures that are not perfectly sealed, and versions with leakage compensation, for tightly sealed enclosures.
How to choose
Classified zone of the installation site
Zone 1 or 2 (gases) and 21 or 22 (dusts) determine the type of pressurization and the system's reaction to loss of pressure - warning or disconnection.
Internal volume of the enclosure
The volume determines the quantity of gas needed for purging and the maintenance flow; it is stated when ordering, together with the number of compartments.
Type of protective gas
Clean instrument air is the usual solution; inert gas is chosen when air would introduce a risk or when the process requires an oxygen-free atmosphere.
Protected equipment and internal sources
Devices with hot parts or internal sparks have stricter requirements; it must be specified whether the equipment stays energised if pressure is lost.
Quality and pressure of the available air
The supply air must be clean, dry and oil-free, at sufficient pressure; check the source in the installation before choosing the unit.
Control and monitoring functions
Decide whether contacts are needed for remote warning, purge timing and an interface to the installation's automation system.
Environmental conditions and materials
For outdoor use, dust and salt mist, choose units and accessories with a suitable IP rating and corrosion resistance.
What to send for a quotation
- The classified zone and the gas or dust group
- The type and dimensions of the enclosure or room to be protected
- The equipment inside and its dissipated power
- The protective gas wanted and the pressure available
- The reaction required on loss of pressure: warning or disconnection
- The signalling requirements and the interface to automation
Typical applications
- Process analysers in classified zones
- Control panels and automation cabinets
- Large electric motors with no Ex protection of their own
- Control rooms in gas installations
Maintenance and spare parts
The tightness of the enclosure and the condition of the gaskets and doors are checked periodically, because leaks increase protective gas consumption. Air filters and condensate separators on the supply line are cleaned according to the schedule. The functional test of the control unit - purge, alarm and disconnection on pressure drop - is carried out at the intervals set in the installation's inspection plan.
Brands we quote for this product type
Frequently asked questions
How does Ex p pressurization protection work?
The enclosure is kept at a slightly higher pressure than the outside environment, with clean air or inert gas, so that flammable gases cannot enter. Before power is applied, the interior is purged to remove any explosive mixture. After that, the control unit monitors pressure or flow and, if they fall below the limit, gives a warning or cuts the supply. The principle is described in Part 2 of the IEC 60079 series.
When is pressurization chosen instead of Ex d or Ex e equipment?
Pressurization is chosen when the equipment needed does not exist in an explosion-proof version, is large or high-powered, or must be accessed often, for example analysers, large panels or high-power motors. The cost and complexity include the gas source and the monitoring, but the solution allows standard devices to be used. For small, simple devices, Ex d or Ex e enclosures are generally more practical.
What data do I need for a pressurization system quotation?
Send the classified zone, the gas group, the dimensions and volume of the enclosure, the equipment inside and its dissipated power, the protective gas, the pressure available and the reaction wanted on loss of pressure. If you have an installation diagram, attach it. Delivery is to order, usually 1–4 weeks; depending on brand and specification it can take longer.
What gas is used for pressurization?
Clean instrument air is normally used, dry and oil-free, taken from a non-hazardous area. Inert gas, such as nitrogen, is chosen when oxygen is to be excluded or when air cannot be supplied under safe conditions. Gas quality matters: moisture, oil and particles can damage the equipment in the enclosure and affect the sensors of the monitoring system.
Updated: 2026-11-12

