Skip to content
+40 371 232 404|Mon - Fri: 08:00 - 16:30 (Romania time)

Iris Power supplier in Romania

Partial discharge monitoring and testing for motors and generators

Founded in 1990 · Headquarters: Mississauga, Canada

Request a quote

Who is Iris Power and what does it make?

Iris Power is a Canadian company founded in 1990, headquartered in Mississauga, near Toronto, specialising in sensors, instruments and services for the condition of large motors and generators. It serves hydro and thermal power plants, heavy industry and grid operators.

The problem it addresses is a source of high costs on medium- and high-voltage machines: stator insulation degradation. Partial discharges appear in voids or on the insulation surface, and monitoring them online, with epoxy-mica capacitor (EMC) or stator slot coupler (SSC) sensors, shows the trend before a ground fault. The continuous GuardII+ system and the portable PDA-IV (hydro generators) and TGA (turbine generators, motors, switchgear) instruments collect this data. Alongside come end-winding vibration monitoring with fibre-optic accelerometers (EVAII, EVTracII), rotor flux, air gap, mechanical vibration, shaft voltage and current, as well as the offline instruments: the PPM-97 corona probe, DeltaMaxx, DCR 60-2, EL CID Evolution for the stator core, the SWA wedge analyser and the RIV802 robotic inspection vehicle.

This equipment is of interest to hydro and thermal power plants with large generators, high-voltage industrial motors and maintenance operators who run tests while the machine is out of service.

What do we supply from the Iris Power range?

ProductDescription
GuardII+Continuous online monitoring instrument for generators and motors: partial discharges, rotor magnetic flux for detecting shorted turns, end-winding vibration, shaft voltage and current, with communication to third-party networks.
PDA-IV and TGAPortable instruments for periodic online monitoring of partial discharges: PDA-IV for hydro generators with 80 pF EMC sensors, TGA for turbine generators, motors, switchgear, dry-type transformers and insulated phase busbars. The data is analysed in the PDView software.
EVAII and EVTracIIThe EVAII fibre-optic accelerometer measures stator end-winding vibration, and EVTracII is the associated monitoring instrument. The optical fibre does not conduct current, so it can sit in the high-voltage area.
EL CID EvolutionStator core test instrument using low flux, used offline to find shorts between laminations. The same offline range includes DCR 60-2 (DC ramp) and the DeltaMaxx analyser (partial discharges, loss factor, capacitance).

Why Iris Power?

  • Online partial discharge monitoring with EMC or SSC sensors — tracks stator insulation degradation during operation, not only at planned outages
  • Fibre-optic accelerometers for end windings (EVAII) — measure radial and tangential vibration in an area at high voltage
  • Online and offline solutions in the same range — GuardII+, PDA-IV, TGA and, separately, EL CID Evolution, DCR 60-2, DeltaMaxx, SWA and RIV802
  • Coverage from hydro generators to turbine generators, motors, switchgear, dry-type transformers and insulated phase busbars
  • EL CID Evolution for the stator core — offline testing by low flux, which finds shorts between laminations

Which Iris Power codes and series are requested most often?

CodeDescription
GuardII+Continuous monitoring for generators and motors
PDA-IVPeriodic online monitoring of partial discharges, hydro generators
TGAPeriodic online monitoring of partial discharges, turbine generators and motors
MICAMAXXLow-frequency partial discharge monitoring
EMCEpoxy-mica capacitor sensor for partial discharges
SSCStator slot coupler for partial discharges
EVAIIFibre-optic accelerometer for end windings
EVTracIIEnd-winding vibration monitoring instrument
PPM-97Corona probe for offline partial discharge tests
DeltaMaxxDigital analyser for partial discharges, loss factor and capacitance
DCR 60-2DC ramp test instrument
EL CID EvolutionStator core test with low flux
SWAStator slot wedge analyser
DRA-3PDTech dielectric response analyser
RIV802Robotic inspection vehicle with camera

Where is Iris Power equipment used?

  • Hydropower plants — monitoring of partial discharges, air gap and vibration on hydro generators
  • Thermal power plants — monitoring of turbine generators and offline stator tests
  • Heavy industry — high-voltage motors, including squirrel-cage rotors
  • Switchgear and insulated phase busbars — partial discharge monitoring
  • Laboratories and maintenance companies — offline testing of the core and the insulation

How do we supply Iris Power in Romania?

We can quote partial discharge sensors, monitoring instruments, fibre-optic accelerometers and offline test instruments from the Iris Power range, plus accessories and parts. Equipment is supplied to order, usually in 1–4 weeks; for monitoring systems configured for a specific machine the lead time can be longer. For a correct quotation, send the machine type (hydro, turbo or motor), the rated power and voltage, the number of phases or slots available for sensors, the quantities to be monitored and whether you already have an Iris Power system installed. The exact lead time is confirmed in the quotation.

The number of sensors and their placement in a machine are decided from the design data of the generator or motor.

Frequently asked questions about Iris Power

What products does Iris Power make?

Iris Power makes sensors, monitoring instruments and offline test instruments for large motors and generators, plus switchgear and dry-type transformers. It is a Canadian company founded in 1990.

How do I choose between PDA-IV and TGA for partial discharge monitoring?

The choice depends on the machine type: PDA-IV is intended for hydro generators with EMC sensors, and TGA for turbine generators, motors, switchgear and insulated busbars. The sensor type depends on the stator design. Tell us the machine type, the voltage and whether monitoring is continuous or periodic.

Do you supply Iris Power equipment in Romania, and how quickly?

Yes, supplied to order. The lead time is usually 1–4 weeks for standard instruments and sensors; systems configured for a specific machine can take longer. We confirm it in the quotation, after the request is checked.

Can I add new sensors to an existing Iris Power system?

It depends on the case; we confirm compatibility on the basis of the data. What matters is the installed instrument (for example GuardII+ or PDA-IV), the type of sensors already fitted and the software version. Send the instrument nameplates and a list of the existing sensors, and we check.

What data do you need for a quotation on an EL CID test instrument?

The inner diameter and the length of the stator core, the machine type (hydro or turbo) and access to the bore. With these data we determine the suitable EL CID version and the accessories needed.

How do I request a Iris Power quotation?

Send the Iris Power code from the nameplate and the quantity; we reply in English with availability and the lead time written in the quotation.

Request a quote

Updated: 21 November 2026 · Sources: Iris Power LP (manufacturer documentation)