ZÖLLNER Signal supplier in Romania
Track work warning, A-CROSS, ZGP and Makrofon horns
Founded in 1946 · Headquarters: Kiel, Germany
Who is ZÖLLNER Signal and what does it make?
ZÖLLNER Signal is a privately owned German company from Kiel, founded in 1946. It started with acoustic signalling for ships and locomotives, and in the 1990s developed automatic visual and audible warning systems for track works, extended in the 2000s to railway infrastructure. It has subsidiaries in the United Kingdom, France, Spain, Poland and Australia. Three areas are of interest: warning personnel working on the track, temporary protection of level crossings and signalling horns for locomotives.
Track work warning systems (ATWS) cover small mobile works, large long-duration works, individual warning (for example for vegetation works, through the CLARIS system with protected radio transmission to headsets), warning on large construction machines and permanent installations. The ZFS radio transmitter can work mobile or stationary, and the ZPW126-10 units are used in track renewal works with the Autoprowa+ system. A-CROSS is an automatic, mobile and temporary level crossing protection system based on axle counting, with personnel needed only for installation and removal.
The ZGP speed monitoring system measures the speed of a vehicle with a wheel sensor and activates the track magnet for emergency braking if the maximum permitted speed is exceeded, in a fixed or mobile version. On the rolling stock side, the Makrofon horns, pneumatic (for example M75F/370.1, ZM75/660) or electric (EM660/370), are TSI/UIC approved, with accessories such as flange heating and sound insulation.
What do we supply from the ZÖLLNER Signal range?
| Product | Description |
|---|---|
| ATWS — track work warning systems | Automatic visual and audible systems for protecting personnel: small mobile configurations, installations for large works, individual warning through CLARIS, warning on machines and permanent systems. The ZFS radio transmitter can be mobile or stationary; the ZPW126-10 unit is used in track renewal works. |
| A-CROSS — mobile level crossing protection | Automatic, mobile and temporary level crossing protection system, based on axle counting, adaptable to the requirements of each country. Usable on light railways, industrial railways and large construction sites; it reduces road closures and needs no additional personnel in operation. |
| ZGP — speed monitoring | System with a wheel sensor that compares the measured speed with the maximum permitted speed and commands the track magnet for emergency braking. There is a stationary version and a mobile version for construction sites or temporarily restricted zones. |
| Makrofon — signalling horns | Pneumatic (M75F, ZM75, M125) and electric (EM660/370) horns for locomotives and other vehicles, with different frequencies, TSI/UIC approved, plus accessories: flange heating for the ZM75 and M75F series, sound insulation and protective grilles. |
Why ZÖLLNER Signal?
- Range of track work warning, from small mobile works to large works — components that can be combined modularly and extended as the work proceeds
- CLARIS individual system with protected radio transmission — warns vegetation workers in their headsets when they cannot hear the train because of the noise
- A-CROSS for temporary level crossing protection based on axle counting — short setup and commissioning, with personnel only at installation
- ZGP for speed monitoring and emergency braking by track magnet — used stationary or mobile, on construction sites and in speed-restricted zones
- Pneumatic and electric Makrofon horns, TSI/UIC approved — with flange heating, sound insulation and protective grilles
Which ZÖLLNER Signal codes and series are requested most often?
| Code | Description |
|---|---|
| ZPW126-10 | Track work warning unit |
| ZFS | Mobile or stationary radio transmitter for warning |
| ZRT 30 | Track work warning system |
| CLARIS | Individual warning system with protected radio transmission |
| A-CROSS | Automatic mobile system for level crossing protection |
| ZGP | Speed monitoring system, stationary or mobile |
| Makrofon M75F/370.1 | TSI Rev.01 pneumatic horn |
| Makrofon M75F/660 | TSI Rev.01 pneumatic horn |
| Makrofon ZM75/660 | Pneumatic horn, AS7532 or TSI version |
| Makrofon M125/370 | TSI Rev.01 pneumatic horn |
| Makrofon EM660/370 | TSI electric horn |
| ZCloud | Data platform of ZÖLLNER systems |
Where is ZÖLLNER Signal equipment used?
- Railway maintenance and construction — warning for personnel on the track
- Level crossings — temporary protection during works
- Rolling stock — signalling horns for locomotives
- Industrial railways and large construction sites — speed monitoring and warning on machines
How do we supply ZÖLLNER Signal in Romania?
We can quote ZÖLLNER components for warning at track works and for rolling stock: radio transmitters, warning units, Makrofon horns and accessories. The equipment is supplied to order; for parts and horns the lead time is usually 1–4 weeks, and for systems configured on site it may be longer and is stated in the quotation. For an accurate quotation we need the length and type of the work, the number of persons protected, the type of warning wanted (collective or individual) and, for horns, the code on the nameplate (for example M75F/370.1), the air pressure or the supply voltage.
Approval of a warning system by a specific infrastructure manager is determined from the project documentation.
Frequently asked questions about ZÖLLNER Signal
What does ZÖLLNER Signal make?
ZÖLLNER Signal, a privately owned company from Kiel founded in 1946, makes track work warning systems (ATWS), mobile level crossing protection (A-CROSS), speed monitoring (ZGP) and Makrofon signalling horns for locomotives, plus equipment for ships.
How do I choose a warning system for track work?
Start from the length and duration of the work, the number of persons, the noise level and the type of activity. For small mobile works lightweight equipment is used, for large works extended installations, and for isolated works individual warning, for example CLARIS.
Can you supply ZÖLLNER components in Romania, and within what lead time?
Yes. ZÖLLNER parts and horns are supplied to order, usually in 1–4 weeks, and systems configured on site may have a longer lead time; the exact value is confirmed in the quotation.
What can replace an old Makrofon horn?
The current range includes pneumatic and electric horns approved to TSI/UIC, but equivalence is confirmed after checking: frequency, working pressure and mounting interface matter. Send the code on the horn and the vehicle type, and we check the suitable version.
What data do you need for a quotation on an A-CROSS system?
The number of tracks at the level crossing, the train speeds, the type of road traffic, the infrastructure manager's requirements, the duration of use and the available power supply. With these data we check the suitable configuration and the documentation needed. If the work is close to a public road, also state the type of road and the number of lanes.
How do I request a ZÖLLNER Signal quotation?
Send the ZÖLLNER Signal code from the nameplate and the quantity; we reply in English with availability and the lead time written in the quotation.
Request a quoteUpdated: 21 November 2026 · Sources: ZÖLLNER Signal GmbH (manufacturer documentation)

