Time Synchronisation and Communications for Utilities
Time synchronisation distributes the same exact time to all equipment in an installation, so that events recorded in different places can be put in order. Utility communications link electrical substations, pumping stations and remote points by radio, fibre or dedicated lines. Together they are the basis for protection, telecontrol and incident analysis in energy, water and transport networks, where a wrong time makes it impossible to reconstruct an event.
A time server receives the time from a satellite navigation system (GNSS) or another source and distributes it over the network through NTP, PTP (IEEE 1588) or dedicated signals such as IRIG-B and pulse per second. NTP is sufficient for logs and workstations, where millisecond-order accuracy is acceptable. PTP reaches sub-microsecond accuracy, needed for synchronised measurements and for the sampled-value streams of IEC 61850-9-2. For electrical substations there are standardised PTP profiles, for example IEEE C37.238 and IEC 61850-9-3.
If the GNSS signal is lost, the clock goes into time-keeping mode (holdover), and the quality of the internal oscillator decides how long the time stays correct. The communications side covers radio modems for areas without fibre, multiplexers and converters for serial and Ethernet circuits, and equipment that carries protection and telecontrol protocols over data lines between stations, often with several backup paths for situations when a link fails.
How to choose
Required synchronisation accuracy
NTP covers logs and supervision; PTP or IRIG-B are chosen for synchronised measurements and protection, where time differences are counted in microseconds.
Time source and antenna protection
Check the type of GNSS receiver, the antenna mounting, the surge protection on the cable and the possibility of using a second time source as backup.
Oscillator quality and holdover
Establish how long the time must stay accurate after the signal is lost; more stable oscillators raise the cost but extend the interval without an external source.
Output interfaces
List your consumers: NTP, PTP, IRIG-B, pulse per second, serial outputs or display clocks, then check that the server provides them directly.
Standards and profiles
In electrical substations, ask for conformity with IEC 61850-3 for the environment and with the PTP profile required by the project; without a matching profile, devices do not synchronise with one another.
Type of communication link
Choose between radio, fibre or leased line according to distance, terrain and availability; for radio, check the permitted frequency band and the transmit power.
Security and management
Check NTP authentication, access control to the configuration and monitoring of clock status, because a falsified or lost time can compromise incident analysis.
What to send for a quotation
- The installation type: electrical substation, pumping station, dispatch centre
- The accuracy required and the synchronisation protocols used
- The number and type of time consumers (NTP, PTP, IRIG-B, pulse)
- The mounting location of the GNSS antenna and the cable length
- The distances and the type of communication links (radio, fibre, line)
- The protocols carried and the standards required by the project
Typical applications
- Electrical substations and dispatch centres
- Water and sewage networks
- Long-distance telecontrol and SCADA
- Incident analysis in energy networks
Maintenance and spare parts
The GNSS antenna and its cable are where problems frequently occur: check the mounting, the surge protection and any obstruction of the sky view. Monitor the synchronisation status and the signal-loss alarms, and for clocks with an internal oscillator track the drift in holdover. For radio modems, periodically check the antennas, connectors and received signal level, and save the configurations after every change.
Brands we quote for this product type
- AMETEK Power Instruments
- Aviat Networks
- Bodet Time
- CXR Networks
- Dedicated Network Partners (DNWP)
- EndRun Technologies
- FreeWave Technologies
- Gorgy Timing
- Masterclock
- Meinberg
- Microchip Frequency and Time Systems
- Microhard Systems
- MOBATIME
- NovaTech Automation
- Oscilloquartz
- PowerComm Solutions
- RACOM
- RAD Data Communications
- SATEL
Frequently asked questions
What is the difference between NTP and PTP, and when do I need PTP?
NTP synchronises equipment with millisecond-order accuracy and is sufficient for logs, workstations and servers. PTP, defined by IEEE 1588, reaches sub-microsecond accuracy when the network and switches support it and is needed for synchronised measurements, sampled-value streams in electrical substations and other applications where small time differences matter. The choice depends on the application and on the equipment in the network.
What happens if I lose the GNSS signal?
The clock goes into time-keeping mode, called holdover, and keeps generating the time based on the internal oscillator. How long the time stays accurate depends on the quality of the oscillator. For critical installations, more stable oscillators or a second time source are used, and the system must signal its state clearly, so that the operator knows whether the time is externally synchronised or only maintained internally.
Why is synchronisation important in electrical substations?
Events from several devices, such as protection relays and disturbance recorders, must be put in exact chronological order to understand how an incident developed. If the clocks differ, the analysis becomes unreliable. Precise synchronisation also allows distributed measurements, compared at the same instant, and protection functions that use data from several points in the network.
What do I send for a quotation, and how long does delivery take?
Send the installation type, the accuracy required, the synchronisation protocols used, the number of time consumers and the antenna mounting location. For communications, add the distances, the transmission medium and the protocols carried. Delivery is 24–72 h when the item is in stock, locally or at the supplier; to order, usually 1–4 weeks, and depending on brand and specification it can take longer.