Wegh Group supplier in Romania
For Wegh Group we quote the METRA electro-hydraulic point machine, the eLCSP level crossing system, with TD96/2 barrier mechanisms and P70 pedals, and prestressed concrete sleepers; we need the turnout type, rail profile and track gauge.
Headquarters: Collecchio, Italy
Who is Wegh Group and what does it make?
Wegh Group, based in Collecchio, near Parma, makes equipment for railway infrastructure: electro-hydraulic point machines for turnouts, protection systems for level crossings, prestressed concrete sleepers and other track precast elements. The equipment serves traffic safety and the construction or renewal of track. For a quotation, send us the type of turnout or level crossing, the track gauge, the rail profile and the requirements for the connection to the interlocking system.
The METRA point machine is an electro-hydraulic system with one or two actuation units, for turnouts with a radius of up to 500 m, a track gauge of 1435 mm and 60E1 rail. It has functional safety, as per the manufacturer's documentation. It detects the closing and locking of the switch blade, obstacles between the switch blade and the stock rail, and any break in the kinematic chain; it stops the movement when it meets an obstacle and quickly returns the line to service after a trailing-through movement; the design prevents the build-up of water, ice and impurities.
For level crossings, the electronic eLCSP system, with functional safety as per the manufacturer's documentation, brings together the control logic, the TD96/2 electric barrier mechanisms, the P70 fluid-electric pedal and LED signals; the equipment follows the specifications of the Italian railway network. Wegh's factories produce more than 40 models of vibrated prestressed concrete sleepers, for conventional lines with standard or metre gauge and for high-speed lines, with elastic pads under the sleeper, plus sleepers for track switches and slab track plates. The company also builds plants for sleeper manufacturing.
What do we supply from the Wegh Group range?
| Product | Description |
|---|---|
| METRA — electro-hydraulic point machine | System with one or two actuation units for turnouts with a radius of up to 500 m, 1435 mm track gauge and 60E1 rail; the first point is mounted on a steel sleeper, the second on a prestressed concrete sleeper. Functional safety, electrical position control and trailing-through management. |
| eLCSP — level crossing protection | Complete electronic safety and protection system for level crossings, with functional safety, control logic, TD96/2 electric barrier mechanisms, P70 fluid-electric pedal and LED signals. The components can also be supplied separately, as parts of an existing system. |
| Prestressed concrete sleepers | More than 40 models of vibrated prestressed concrete sleepers, with direct or indirect fastenings, for conventional lines with standard or metre gauge and for high-speed lines, where elastic pads under the sleeper are used. They are used on railways, metro and tram. |
| Track precast elements and manufacturing plants | Sleepers for track switches, slab track plates and track systems for metro, tram, ports and logistics terminals. Wegh also designs plants for manufacturing sleepers, of the long-line or carousel type. |
Why Wegh Group?
- METRA with functional safety — a point machine for traffic safety functions
- Detection of obstacles between the switch blade and the stock rail and of breaks in the kinematic chain — the movement stops before damage occurs
- Design that prevents the build-up of water, ice and impurities — operation at extreme temperatures and under vibration
- The eLCSP level crossing system, with functional safety — control logic, barriers and signals come from the same programme
- More than 40 models of prestressed concrete sleepers — for standard and metre gauge and for high-speed lines
Which Wegh Group codes and series are requested most often?
| Code | Description |
|---|---|
| METRA | Electro-hydraulic point machine for turnouts, with functional safety |
| eLCSP | Electronic safety and protection system for level crossings |
| TD96/2 | Electric barrier mechanism for level crossings |
| P70 | Fluid-electric pedal for level crossings |
| LED signals | LED signals for level crossings |
| Track sleepers | Vibrated prestressed concrete sleepers, standard or metre gauge |
| Sleepers with USP pads | Sleepers for high-speed lines, with elastic pads under the sleeper |
| Sleepers for track switches | Concrete sleepers for turnouts |
Where is Wegh Group equipment used?
- Railway infrastructure — turnouts and level crossings on modernised lines
- High-speed lines — sleepers with elastic pads under the sleeper
- Metro and tram — sleepers and track systems
- Ports and logistics terminals — track systems for industrial lines
- Precast concrete factories — plants for sleeper production
How do we supply Wegh Group in Romania?
We can quote METRA point machines, level crossing components (TD96/2 barrier mechanisms, P70 pedals, LED signals), spare parts and prestressed concrete sleepers. For a quotation, send us the type and radius of the turnout, the rail profile, the track gauge, the sleeper type and the interface with the interlocking system; for sleepers, the model and the rail fastening system. Small parts can ship in 24–72 h when the item is in stock, locally or at the supplier; equipment is supplied to order, usually in 1–4 weeks, and systems delivered on a project basis may have a longer lead time, depending on the specification.
Technical acceptance of a point machine or of a level crossing system on the Romanian network is obtained separately, on a project basis.
Frequently asked questions about Wegh Group
What does Wegh Group make?
Equipment and precast elements for railways: the METRA electro-hydraulic point machine for turnouts, level crossing protection systems with barriers and signals, prestressed concrete sleepers for conventional, high-speed, metro and tram lines, sleepers for track switches and plants for manufacturing sleepers.
Which turnouts is the METRA point machine suitable for?
METRA works with one or two actuation units and is built for turnouts with a radius of up to 500 m, 1435 mm track gauge and 60E1 rail, with the first actuation point on a steel sleeper and the second on a prestressed concrete sleeper. For other geometries, send us the turnout drawing.
Do you supply Wegh Group equipment in Romania, and with what lead time?
Yes, Wegh equipment is supplied to order. Components can ship in 24–72 h when the item is in stock, locally or at the supplier; standard equipment usually takes 1–4 weeks. Complete level crossing systems or batches of sleepers are planned on a project basis and have a longer lead time, depending on the specification.
What needs to be checked before installing METRA or eLCSP on a line?
The connection to the existing interlocking system, the electrical supply, the turnout geometry and the technical acceptance requirements of the infrastructure manager. METRA has functional safety as per the manufacturer's documentation, but approval on the local network remains a separate step; send us the project documentation so that we can prepare the quotation.
What data do I send for a quotation for concrete sleepers?
The track gauge (standard or metre), the line type (conventional, high-speed, metro or tram), the rail profile, the fastening system and whether you want elastic pads under the sleeper. Wegh has more than 40 models of vibrated prestressed concrete sleepers, and dedicated sleepers exist for track switches.
How do I request a Wegh Group quotation?
Send the Wegh Group code from the nameplate and the quantity; we reply in English with availability and the lead time written in the quotation.
Request a quoteUpdated: 21 November 2026 · Sources: WEGH Group S.p.A. (manufacturer documentation)

