The electricity meter measures active energy and, on many models, reactive energy and power, for settlement or for monitoring consumption. AMI (advanced metering infrastructure) systems add two-way communication: the meters send readings automatically to a data centre, without an operator having to travel. The choice depends on the type of network, the accuracy class, the purpose of the measurement - settlement or internal monitoring - and the communication mode of the central system.

Modern electronic meters continuously multiply voltage and current and integrate the result over time. Single-phase meters are used for small consumers and three-phase meters for industrial consumers, with direct connection up to a given current value, above which current transformers are used and, at medium voltage, voltage transformers as well. Multifunction meters measure active and reactive energy in four quadrants, maximum demand, time-of-use tariffs and voltage quality. Active energy meters intended for settlement in commercial and light industrial use fall under the Measuring Instruments Directive (MID) 2014/32/EU and bear the marking it requires; accuracy classes are defined in the IEC 62053 series and, for meters with MID marking, in EN 50470 (classes A, B and C).

An AMI system connects the meters to a concentrator and to a central data management system. Communication can use power line carrier, a cellular network, radio or Ethernet. The usual data protocol is DLMS/COSEM, described in the IEC 62056 series, which standardises the data objects and makes interoperability possible. Communication security, the operator's data requirements and compatibility with the existing system decide the choice.

How to choose

Type of network and connection

Single-phase or three-phase, three or four wires; direct connection or through current transformers, depending on the maximum current of the consumer.

Accuracy class

For settlement, the class is set according to the applicable rules and the power level; for internal consumption monitoring, a less strict class may be sufficient.

Quantities measured

Active energy, reactive energy, maximum demand, load profiles and voltage quality; establish what data your operator or your energy management system requires.

Compliance for settlement

For billing between parties, the meter must meet legal metrology requirements, including the marking required by the MID, and have protective seals.

AMI communication mode

Power line carrier, cellular network, radio or Ethernet; the choice depends on the coverage at the installation site, the existing infrastructure and the desired reading frequency.

Protocol and interoperability

Check that the meter speaks the protocol of the central system, for example DLMS/COSEM or Modbus for integration into automation systems.

Mounting and environment

DIN-rail meter in a board or meter with a terminal block on a panel, degree of protection, temperature and available space; meters installed outdoors need a suitable enclosure.

What to send for a quotation

  • The network type: single-phase or three-phase, rated voltage
  • The maximum current and whether current transformers are used
  • The purpose: settlement or internal monitoring
  • The quantities required: active energy, reactive energy, maximum demand
  • The communication interface and the protocol of the central system
  • The number of meters and the installation location

Typical applications

  • Settlement between operator and consumer
  • Sub-metering by department and building
  • Monitoring consumption in industry
  • Smart grid and remote reading projects

Maintenance and spare parts

Electronic meters need no maintenance in operation, but the seals and terminals are inspected periodically to detect unauthorised interference with the meter or overheating. Metrological verifications are carried out at the intervals required by regulations for settlement meters. In an AMI system, the state of communication, the load on the concentrator and firmware updates are monitored, and the internal clock battery, where present, is checked in accordance with the instrument's instructions.

Brands we quote for this product type

Frequently asked questions

What is AMI and how does it differ from conventional meter reading?

AMI, advanced metering infrastructure, adds two-way communication with a central system to the meters. Readings are sent automatically, at a frequency much higher than monthly, and the system can send commands or parameters to the meter. The benefits are detailed consumption data, quick detection of anomalies and fewer site visits. Implementation requires compatibility between meters, concentrators and software.

When do I need current transformers on a three-phase meter?

A direct-connection meter supports a limited maximum current, indicated on the instrument. Above this value, current transformers are used, which reduce the network current to a measurable value, and the meter is sized for transformer-connected operation. The choice of transformation ratio must match the real current of the consumer, and the polarity and class of the transformers influence the accuracy of the entire measuring chain.

What do I send for a quotation for meters or AMI systems, and how long does delivery take?

State the network type, the maximum current, the purpose of the measurement, the quantities required, the communication interface and the protocol of the central system, plus the number of meters. For AMI projects, also describe the existing infrastructure. Delivery is 24–72 h when the item is in stock, locally or at the supplier, and for made-to-order versions it typically takes 1–4 weeks; it may take longer depending on the brand and the specifications.

Can I use any meter for billing between two companies?

In general, no. For settlement, the meter must meet legal metrology requirements, including conformity assessment under the MID, have seals and, where applicable, periodic metrological verifications. A meter intended for internal monitoring does not usually have these attributes and cannot serve as a basis for billing. Clarify the purpose of the measurement from the start, so that the right instrument is chosen.