Hitachi Energy supplier in Romania
For Hitachi Energy we quote OIP and RIP bushings, CoreSense M10 DGA analysers, tap changer parts, electrical insulating board, POLIM-S..N surge arresters and ETL600 R4 systems, based on the nameplate and the rated voltage.
Headquarters: Zürich, Switzerland
Who is Hitachi Energy and what does it make?
Hitachi Energy is a technology company based in Zürich, Switzerland, active in high-voltage equipment, transformers and energy solutions. The range includes components and auxiliary equipment: bushings for transformers, transformer monitoring, on-load tap changers, electrical insulating materials, medium-voltage surge arresters and high-voltage line communications. Large power transformers are outside our offer.
In power networks, bushings are the parts through which the transformer windings exit through the cover. The company makes three technologies: OIP, with an oil-impregnated paper core and porcelain insulators; RIP, with resin-impregnated paper and a composite housing with silicone sheds or porcelain, used on transformers, reactors and AC switchgear; and RIS, with a wound core of synthetic fabrics impregnated with epoxy resin, available for AC transformers and reactors. For transformer condition, CoreSense M10 is an online nine-gas DGA analyser with an FTIR spectrometer, with no consumables and no calibration gas, connected to the CoreTec 4 hub of the TXpert ecosystem.
Conventional on-load tap changers are based on over 100 years of experience, with few parts and configurable motor drives, while electrical insulating board made of unbleached cellulose is used in transformers from 11 kV up to 1,200 kV AC and 800 kV DC. The POLIM-S..N arrester has a silicone housing, for AC systems up to 72 kV, and ETL600 R4 carries voice, data and protection commands over high-voltage lines.
What do we supply from the Hitachi Energy range?
| Product | Description |
|---|---|
| OIP, RIP and RIS bushings | Condenser bushings for AC and DC transformers and reactors, in oil-paper technology (OIP), resin-paper technology (RIP) or the RIS family, with a porcelain or composite housing, selected by voltage and current. |
| CoreSense M10 and the TXpert ecosystem | Online multi-gas DGA analyser that measures nine gases in mineral, ester and silicone oils, with moisture, with a single mounting flange, connected to the CoreTec 4 hub for monitoring a fleet of transformers. |
| Tap changers and electrical insulating materials | Conventional on-load tap changers, electrical insulating boards, pressed paper and formed insulation parts for transformers, used in repairs, retrofit and transformer manufacturing; parts are selected by tap changer type, voltage and the data on the transformer nameplate. |
| POLIM-S..N and ETL600 R4 | Medium-voltage arresters in a silicone housing, with metal-oxide resistors, and the ETL600 R4 power line carrier system, analogue or digital, for voice, data and protection commands over high-voltage lines. |
Why Hitachi Energy?
- Three bushing technologies — OIP, RIP and RIS, for transformers, reactors and switchgear, from AC to DC
- DGA analyser with no consumables — CoreSense M10 measures nine gases and moisture with FTIR, with no calibration gases and a pumpless oil circuit
- Simple tap changers — designs with few parts and configurable motors, with the option of later conversion to vacuum technology
- In-house electrical insulating board — unbleached long-fibre cellulose, for transformers and electrical machines
- POLIM-S..N silicone arrester — gapless metal-oxide, tested to IEC 60099-4, for AC systems up to 72 kV
Which Hitachi Energy codes and series are requested most often?
| Code | Description |
|---|---|
| OIP | Oil-impregnated paper bushing |
| RIP | Resin-impregnated paper bushing |
| RIS | Bushing with a core of synthetic fabrics impregnated with resin, for AC transformers and reactors |
| CoreSense M10 | Online multi-gas DGA analyser, TXpert Ready |
| CoreTec 4 | TXpert hub for transformer sensors |
| TXpert | Sensor and monitoring ecosystem for transformers |
| Conventional OLTC | Conventional on-load tap changer |
| Pressboard | Cellulose electrical insulating board for transformers |
| POLIM-S..N | Silicone arrester for MV, up to 72 kV |
| ETL600 R4 | Power line carrier system for high-voltage lines |
Where is Hitachi Energy equipment used?
- Power transformers — bushings and DGA monitoring
- Substations — medium-voltage surge arresters
- Transformer repair and retrofit — tap changers and electrical insulating materials
- High-voltage lines — ETL600 R4 power line carrier communications
- Industrial energy — DGA monitoring of in-house transformers
How do we supply Hitachi Energy in Romania?
We can quote bushings, CoreSense analysers, tap changer parts, electrical insulating materials and POLIM arresters, starting from the nameplate of the existing equipment. Items are supplied to order, and depending on the specification the lead time may be longer. For a correct quotation we need the type and series of the bushing or analyser, the rated voltage, the rated current, the oil type and the data on the transformer nameplate, if it concerns spare parts.
Large power transformers are outside our offer, and components are offered only on the basis of the nameplate and the exact type of the equipment.
Frequently asked questions about Hitachi Energy
Which Hitachi Energy lines can you quote?
We offer OIP, RIP and RIS bushings, CoreSense and TXpert transformer monitoring, tap changers, electrical insulating materials, POLIM medium-voltage arresters and the ETL600 R4 system. Large power transformers are outside our offer.
How do I choose between an OIP and an RIP bushing?
OIP has an oil-impregnated paper core, usually with porcelain at the ends, while RIP has a resin-impregnated paper core and a composite housing with silicone or porcelain, so it is a dry version. Tell us the voltage, the current, the mounting and the transformer data, so that we can guide the choice of type.
Do you supply Hitachi Energy components in Romania, and in what lead time?
Yes. Components are supplied to order, usually in 1–4 weeks for common items. Bushings and analysers are configured equipment, so the lead time may be longer and we confirm it in the quotation.
Can I replace an old bushing with a current one?
It can be checked on the basis of the bushing nameplate: the voltage, current, length, flange and connection must match. We confirm equivalence on the basis of the nameplate data; send us the nameplate, the outline drawing and the transformer data, and we analyse the case before the quotation.
What data do I need to send for a DGA analyser quotation?
Send the transformer type and its rating, the oil type (mineral, ester or silicone), the position of the mounting valve, the communication protocols required and whether you want integration with the CoreTec 4 hub. For spare parts, add the analyser type and the serial number from its nameplate.
How do I request a Hitachi Energy quotation?
Send the Hitachi Energy code from the nameplate and the quantity; we reply in English with availability and the lead time written in the quotation.
Request a quoteUpdated: 21 November 2026 · Sources: Hitachi Energy (manufacturer documentation)

