MTE Meter Test Equipment supplier in Romania
Electricity meter test equipment, online transformer monitoring, reference standards
Founded in 1996 · Headquarters: Zug, Switzerland
Who is MTE Meter Test Equipment and what does it make?
MTE Meter Test Equipment is a Swiss manufacturer based in Zug, active since 1996, specialising in equipment for testing and certifying electricity meters and in online transformer monitoring systems. The range covers stationary test benches for meter manufacturers' production lines, portable reference standards for field verification and the HYDROCAL family, dedicated to dissolved gas analysis (DGA) in oil. MTE means access to reference instruments and test systems for electricity meters.
What sets the company apart is the accuracy class: its standards reach 0.005 (50 ppm), a precision required when calibrating other standards, not only when verifying commercial meters. The portable three-phase current sources of the PPS family deliver up to 120 A for testing high-capacity meters directly at the installation site, and the HYDROCAL 1011 genX system uses membrane-free NIR technology for continuous monitoring of the gases in transformer oil.
For the Romanian market, the MTE range makes sense for legal metrology laboratories, for meter manufacturers or importers that need test benches, and for grid operators that monitor the condition of large transformers with online DGA systems, not only with periodic sampling.
What do we supply from the MTE Meter Test Equipment range?
| Product | Description |
|---|---|
| K2008 | Three-phase comparator of class 0.005 (50 ppm), with directly connected voltage and current inputs, 88–264 VAC supply, used for calibrating other power and energy standards in metrology laboratories. |
| PPS 400.3 | Portable three-phase current and voltage source, available in 12 A and 120 A versions, for testing electricity meters directly at the point of installation. |
| HYDROCAL 1011 genX | Online multi-gas solution for dissolved gas analysis in transformer oil (DGA), based on near-infrared (NIR) technology, membrane-free and maintenance-free. |
| CheckMeter 2.3 genX | Portable unit for testing class 0.2 meters, genX generation (CheckMeter 2.3 genX, three-phase, with a single-phase option), for verifying energy meters in the field. |
Why MTE Meter Test Equipment?
- Accuracy class 0.005 (50 ppm) on the K2008 reference standards — suited to calibrating other standards, not only ordinary meters
- PPS 400.3 portable three-phase sources up to 120 A — testing of high-capacity meters directly in the field
- Membrane-free DGA monitoring — HYDROCAL 1011 genX measures dissolved gases using NIR technology, maintenance-free
- Unified CAlegration® software — controls both the stationary benches and the portable standards from the same interface
- Modular stationary systems — from individual positions to automated lines for high-volume meter manufacturers
Which MTE Meter Test Equipment codes and series are requested most often?
| Code | Description |
|---|---|
| K2008 | Three-phase comparator, class 0.005 (50 ppm) |
| SRS 121.1 DC | Stationary reference standard, direct current |
| SRS 121.3 / 200 A | Three-phase stationary reference standard, 200 A |
| PRS 600.3 | Portable reference standard, class 0.02 |
| PWS 2.3 genX | Portable reference standard, class 0.1 |
| PWS 3.3 | Portable reference standard, class 0.05 or 0.1 |
| PWS 3.3 genX | Portable reference standard, genX generation, class 0.05 |
| PPS 400.3 | Portable three-phase source, 12 A or 120 A |
| ZVE System | Stationary power source for test benches |
| CheckSource 2.3 | Compact portable source for field verification |
| CheckMeter 2.3 genX | Portable test unit, class 0.2 |
| PTS 400.3 PLUS | Automated portable three-phase meter test system |
| HYDROCAL 1011 genX | Online DGA monitoring using NIR technology |
| Meter Test Systems | Family of single-/three-phase stationary benches for manufacturers |
| Multi Position Test Systems | Modular benches with multiple positions for series testing |
| Automatic Test Systems | Automated test lines for high production volumes |
Where is MTE Meter Test Equipment equipment used?
- Legal metrology — verification and certification of electricity meters
- Meter manufacturers — stationary test benches for production lines
- Grid operators — online DGA monitoring of power transformers
- Calibration laboratories — reference standards of class 0.005
How do we supply MTE Meter Test Equipment in Romania?
We can quote MTE portable reference standards and HYDROCAL modules for transformer monitoring, based on the manufacturer's technical documentation. We supply to order, usually 1–4 weeks, depending on the configuration required. For a correct quotation, send us the accuracy class required, the type of meter or transformer concerned and, where applicable, the number of channels of the system. This range is supplied to order: as these are metrology instruments configured to order, each unit is confirmed before the final quotation is issued.
We check the availability of a specific configuration before the quotation.
Frequently asked questions about MTE Meter Test Equipment
What does MTE Meter Test Equipment make?
MTE makes Swiss equipment for testing and certifying electricity meters — reference standards, portable or stationary current and voltage sources — plus the HYDROCAL system for online monitoring of the gases dissolved in transformer oil. The range is used both by meter manufacturers and by the legal metrology laboratories that verify their accuracy.
How do I choose an MTE reference standard by accuracy class?
The accuracy class of the standard must be several times finer than that of the meter under test — for example, a class 0.005 K2008 can in turn calibrate other standards of class 0.1 or 0.2. Send us the class of the meter being verified and the type of network (single- or three-phase) so that we can identify the suitable model.
Can you supply MTE equipment in Romania, and within what lead time?
Yes, supplied to order; the lead time is usually 1–4 weeks, depending on the configuration, and availability is confirmed in the quotation. These metrology systems are supplied to order, as they are configured for each application.
What details should I state for a HYDROCAL system quotation?
Please state the power and type of the transformer being monitored, whether the installation already has a communication port for SCADA integration and whether you want continuous monitoring or multiple measuring points. On the basis of these data we check the exact configuration before the quotation.
Does MTE Meter Test Equipment also offer calibration certificates for the standards supplied?
Calibration certificates, where required for MTE equipment, are issued on request by the manufacturer or by an accredited third-party laboratory; issuing them is outside our offer, and we point you to the right source.
How do I request a MTE Meter Test Equipment quotation?
Send the MTE Meter Test Equipment code from the nameplate and the quantity; we reply in English with availability and the lead time written in the quotation.
Request a quoteUpdated: 22 November 2026 · Sources: MTE Meter Test Equipment AG (manufacturer documentation)

