Lucy Electric supplier in Romania
Medium-voltage ring main units, SF6-insulated and SF6-free; package substations
Who is Lucy Electric and what does it make?
Lucy Electric is a British manufacturer of medium-voltage switchgear for utilities, industry and commercial buildings. The company has over 100 years of experience, has sites in the United Kingdom, the United Arab Emirates, Saudi Arabia, India, Thailand, South Africa and Brazil and serves customers in over 50 countries. The range includes ring main units (RMU), package substations, equipment for overhead lines and automation, plus low-voltage equipment and electric vehicle charging infrastructure.
Lucy ring main units are divided by insulation and voltage. Sabre and Aegis Plus are SF6-insulated, for voltages up to 24 kV, Sabre with side or rear cable entry, Aegis Plus with front entry. Aegis 36 is an SF6-insulated RMU for voltages up to 38 kV and current up to 630 A, with 3 or 4 functions in a single stainless steel enclosure, a vacuum interrupter, motorisation for remote control and DIN 400 type C terminals; it can be installed indoors or outdoors and serves secondary networks, wind and photovoltaic parks and battery storage. The EcoTec versions, Sabre EcoTec (up to 17.5 kV, transformer-mounted) and Aegis EcoTec (12 kV, front entry), use synthetic air, without SF6. Trident is an oil RMU with a switch-fuse combination, up to 15.5 kV.
Such units are used in transformer substations, for the medium-voltage connection of renewable parks and in industrial installations. For a quotation, what matters is the voltage, the number and type of functions, the current, the cable entry and the remote control requirements.
What do we supply from the Lucy Electric range?
| Product | Description |
|---|---|
| Sabre and Sabre EcoTec | Sabre is an SF6-insulated RMU for voltages up to 24 kV, with side or rear entry. Sabre EcoTec is the synthetic air version, without SF6, transformer-mounted, for voltages up to 17.5 kV. |
| Aegis Plus, Aegis EcoTec and Aegis 36 | Family with front entry: Aegis Plus (SF6, up to 24 kV), Aegis EcoTec (synthetic air, 12 kV) and Aegis 36 (SF6, up to 38 kV, 630 A, 3–4 functions, vacuum interrupter, optional motorisation). |
| Trident | Oil RMU with a switch-fuse combination for voltages up to 15.5 kV, intended for secondary distribution. |
| Overhead lines and automation | Equipment for overhead networks, line automation solutions (RTU) and package substations, plus low-voltage equipment and electric vehicle charging infrastructure. |
Why Lucy Electric?
- Synthetic air versions, without SF6 — Sabre EcoTec (up to 17.5 kV) and Aegis EcoTec (12 kV)
- Aegis 36 for 36–38 kV networks — compact RMU with 3 or 4 functions, 630 A, for wind and photovoltaic parks and storage
- Sabre and Aegis Plus up to 24 kV — SF6 gas, with side, rear or front cable entry
- Motorisation for remote control and DIN 400 type C terminals — ready for network automation
- Trident with oil for 15.5 kV — switch-fuse combination for transformers
Which Lucy Electric codes and series are requested most often?
| Code | Description |
|---|---|
| Sabre | SF6 RMU, up to 24 kV |
| Sabre EcoTec | Synthetic air RMU, up to 17.5 kV, transformer-mounted |
| Aegis Plus | SF6 RMU, up to 24 kV, front entry |
| Aegis EcoTec | Synthetic air RMU, 12 kV, front entry |
| Aegis 36 | SF6 RMU, up to 38 kV, 630 A |
| Trident | Oil RMU with switch-fuse combination, 15.5 kV |
| Package substations | Medium-voltage package substations |
| Overhead line products | Equipment for overhead lines |
Where is Lucy Electric equipment used?
- Transformer substations — RMU for secondary distribution
- Wind and photovoltaic parks — medium-voltage connection with Aegis 36
- Battery storage — 36–38 kV switchgear for new installations
- Industry and commercial buildings — compact medium-voltage switchgear
- Overhead networks — equipment and automation for distribution lines
How do we supply Lucy Electric in Romania?
We can quote Lucy Electric ring main units from the Sabre, Aegis and Trident families, with the SF6-free versions, plus equipment for overhead lines. Supplied to order, usually in 1–4 weeks for accessories and parts; configured units (number of functions, motorisation, cable entry) can have longer lead times, depending on the specification. For a correct quotation, please send us the rated voltage, the current, the function configuration (for example 3 or 4), the insulation type required (SF6 or synthetic air), the cable entry, the short-circuit level and whether remote control is required. The exact lead time is confirmed in the quotation.
Dimensional compatibility with an existing substation is confirmed against its plan, and the short-circuit level is established from the substation data, not from the rated voltage.
Frequently asked questions about Lucy Electric
What product range does Lucy Electric have?
Lucy Electric, a British company, makes medium-voltage switchgear: Sabre, Aegis and Trident ring main units (with SF6, with synthetic air or with oil), package substations, equipment for overhead lines and automation, plus low-voltage equipment.
How do I choose between an SF6 RMU and a synthetic air one?
Voltage and operator policy decide. EcoTec (Sabre EcoTec up to 17.5 kV, Aegis EcoTec 12 kV) uses synthetic air, no SF6; Sabre, Aegis Plus (up to 24 kV) and Aegis 36 (up to 38 kV) use SF6. From 1 January 2026, the EU restricts commissioning new SF6 switchgear up to 24 kV, with exceptions under Regulation (EU) 2024/573.
Do you supply Lucy Electric equipment in Romania, and how quickly?
Yes, to order; usually 1–4 weeks for accessories and parts, while configured units can take longer, depending on the specification. The exact lead time appears in the quotation.
Can I replace an older RMU with an Aegis or a Sabre?
It depends on the voltage, the current, the number of functions, the cable entry and the dimensions of the substation. Compatibility is confirmed after checking, not assumed from the name: send us the nameplate of the old unit and the substation diagram, and the check is made before the quotation.
What information do you need for a quotation on an Aegis 36?
The voltage (up to 36–38 kV), the current, the configuration (3 or 4 functions), whether a vacuum interrupter and motorisation are required, the installation location (indoor or outdoor) and the short-circuit level. This also applies to wind or photovoltaic parks.
How do I request a Lucy Electric quotation?
Send the Lucy Electric code from the nameplate and the quantity; we reply in English with availability and the lead time written in the quotation.
Request a quoteUpdated: 23 November 2026 · Sources: Lucy Electric (manufacturer documentation)