Progress Rail supplier in Romania
For Progress Rail we quote FUES EPOS axlebox detectors, the RAD-X system, dragging equipment detectors and AEI readers; we need the type of checkpoint, the track gauge and the codes of the components to be replaced.
Who is Progress Rail and what does it make?
Progress Rail makes railway equipment, including monitoring systems for moving trains and signalling devices for the protection of rail assets. This range includes the FUES EPOS overheated axlebox and wheel detectors, dragging equipment detectors, AEI readers for identifying wagons, wheel impact detectors, weighing-in-motion systems and acoustic detectors. For a quotation, send us the type of checkpoint, the track gauge and the components to be replaced.
The checkpoints are designed and made in Europe: the engineering teams work in Germany, and production takes place at a plant in Italy, with over 1,900 systems installed. FUES EPOS (Easy Pull-Out System) measures on the track the temperature of axleboxes, wheels and brakes and is built modularly, for different track gauges and climates, from the Arctic Circle to the desert. The data is centralised in the RAD-X display and management system, with a mobile app and predictive functions based on acoustic data. For level crossings there is the MIRA safety system, with functional safety according to the manufacturer's documentation.
For infrastructure managers and freight operators in Romania, the range answers a concrete problem: a faulty bearing or a seized brake must be seen before they cause a derailment. Besides detectors, the range includes the ARGUS and OSCAR platforms, which collect data from the trackside equipment and generate maintenance reports for rolling stock.
What do we supply from the Progress Rail range?
| Product | Description |
|---|---|
| FUES EPOS | Overheated axlebox and wheel detector (HBD) with an easy pull-out system, which measures and analyses on the track the temperature of bearings, wheels and brakes. It is modular, is supplied for various track gauges and works in all climatic zones. |
| RAD-X | Display and management system for trackside checkpoints: it actively manages trains and alarms, equipment status and predictive functions for planning rolling stock repairs, including from acoustic data; it also has a mobile app. |
| Dragging equipment detectors and AEI | Dragging equipment detectors protect sleepers, track and load from parts hanging under the train; the In-Tie version is fitted in the sleeper. AEI readers automatically identify wagons through passive tags fitted on both sides. |
| ARGUS and OSCAR | Software platforms for predictive monitoring: ARGUS builds a picture of vehicle performance from trackside detector data, and OSCAR automatically generates maintenance reports and keeps the asset protection data. |
Why Progress Rail?
- Trackside detection of running defects — FUES EPOS measures the temperature of axleboxes, wheels and brakes as the train passes
- Modular construction — checkpoints adapt to different track gauges and climates and are installed with a short line closure time
- Centralised data — RAD-X and the mobile app manage the alarms, while ARGUS and OSCAR turn measurements into maintenance reports
- Level crossing safety — the MIRA system, with functional safety according to the manufacturer's documentation
- Complementary detectors — dragging equipment, wheel impact, weighing in motion and acoustic detection
Which Progress Rail codes and series are requested most often?
| Code | Description |
|---|---|
| FUES EPOS | Overheated axlebox and wheel detector |
| RAD-X | Display and management system for checkpoints |
| TIS ADD | Acoustic detection for repair planning |
| MIRA | Level crossing safety system, with functional safety |
| Micro Hot Bearing Detector | Overheated bearing detector |
| Micro Talker | Real-time reporting unit for defect detectors |
| Advanced Concept Scanner II | Rail-mounted scanner for defect detection |
| AEI Tag Reader | Reader for automatic wagon identification |
| Dragging Equipment Detector | Detector of equipment dragging under the train |
| In-Tie Dragging Equipment Detector | Dragging equipment detector fitted in the sleeper |
| Event Analyzer | Trackside event recorder for level crossings |
| ARGUS | Vehicle performance monitoring platform |
| OSCAR | Predictive maintenance reporting system |
Where is Progress Rail equipment used?
- Rail infrastructure management — checkpoints for detecting defects on moving trains
- Rail freight transport — monitoring of wagon bearings and brakes
- Passenger transport — fleet monitoring and maintenance planning
- Traffic safety — protection of level crossings
How do we supply Progress Rail in Romania?
We can quote FUES EPOS detectors, spare components for checkpoints, dragging equipment detectors and AEI readers, as well as the associated software systems. For a correct quotation we need the type and generation of the existing checkpoint, the track gauge, the maximum line speed, the number of monitored tracks and the list of components to be replaced, with the codes on them. Supply is to order, usually 1–4 weeks; for complete checkpoints, depending on the specification, the lead time can be longer.
The composition of a new checkpoint is established from the line data: track gauge, speed, number of tracks and the way alarms are transmitted.
Frequently asked questions about Progress Rail
What rail monitoring systems does Progress Rail make?
Progress Rail makes checkpoints for moving trains: FUES EPOS overheated axlebox and wheel detectors, wheel impact detectors, weighing in motion, acoustic detection, dragging equipment detectors and AEI readers, plus the RAD-X, ARGUS and OSCAR software systems.
What should I know when choosing an axlebox detector?
What matters is the track gauge, the maximum speed of the trains, the type of sleepers, the number of tracks and the way the alarm reaches the dispatcher. FUES EPOS is modular, so the configuration is set on the line. Send us this data and the diagram of the existing checkpoint, if there is one.
How soon can I receive Progress Rail components?
Progress Rail spare components are supplied to order, usually 1–4 weeks. A part can ship in 24–72 h when the item is in stock, locally or at the supplier, and for complete checkpoints, depending on the specification, the lead time can be longer.
Can you supply parts for an older FUES checkpoint?
We start from the codes on the existing modules and from the generation of the system. If the old module is no longer made, we check which current FUES EPOS version can be integrated into the checkpoint and tell you before the order which components must be replaced together.
What data should I send for a quotation on train monitoring equipment?
Send the equipment type (axlebox detector, dragging equipment detector, AEI reader), the track gauge, the line speed, the number of tracks, the type of sleepers, the available power supply and the communication method with the dispatch centre. For replacements, add the codes on the existing components.
How do I request a Progress Rail quotation?
Send the Progress Rail code from the nameplate and the quantity; we reply in English with availability and the lead time written in the quotation.
Request a quoteUpdated: 21 November 2026 · Sources: Progress Rail (manufacturer documentation)

